{"id":36554,"date":"2021-09-04T05:16:24","date_gmt":"2021-09-04T05:16:24","guid":{"rendered":"https:\/\/memumbai.com\/?p=36554"},"modified":"2021-09-04T05:16:27","modified_gmt":"2021-09-04T05:16:27","slug":"facts-about-first-waste-to-energy-plant-in-mumbai","status":"publish","type":"post","link":"https:\/\/memumbai.com\/facts-about-first-waste-to-energy-plant-in-mumbai\/","title":{"rendered":"Facts About First Waste-To-Energy Plant in Mumbai"},"content":{"rendered":"\n

First time in Mumbai, BMC has set up a waste-to-energy Bio methanation plant which will convert the wet waste into electricity and gas.<\/p>\n\n\n\n

Mumbai city generates more than 9000 metric tonnes of waste daily..In this 70 percent is wet waste. In the past couple of years, BMC has been able to reduce around 1,000 metric tonnes of garbage. It was possible due to the introduction of compulsory processing of waste by Societies, hotels generating more than 100 kg waste daily on their premises, and segregation of wet and dry waste. Many of them are flouting the rule despite several notices.<\/p>\n\n\n\n

Here are some of the facts of\nWaste to Energy (WTE) plant:<\/p>\n\n\n\n